Perth solar system upgrades

Adding panels or a hybrid inverter to an existing Perth system - upgrade path without starting again

Looking to add solar panels Perth homes already have on the roof? You can often expand an existing system, or add a hybrid inverter for a battery-ready path, without starting again. Here is the 2026 upgrade guide for Perth WA homes.

Book an existing-system assessment
Rooftop array showing how to add solar panels Perth homes can expand

Thousands of Perth homes already have rooftop solar from earlier years. Many now want to add solar panels Perth households first installed years ago, after air-conditioning, heat-pump hot water, work-from-home loads or an electric vehicle pushed daytime use higher. The bill climbs even though the roof still has space, the inverter may still have spare capacity, or a solar inverter upgrade Perth homeowners often want would unlock a battery without rebuilding the whole array.

You do not always need a full rip-and-replace. The two main upgrade paths are to add solar panels Perth systems can still support, or to add or replace with a hybrid inverter so the site is battery-ready - or both, when the design allows. This guide explains when each path suits a Perth home under Western Australian rules from 1 May 2026, how Small-scale Technology Certificates (STCs) apply to extra panels, and the practical steps your installer should follow.

Quick answer

To add solar panels Perth homes already run without starting again, choose extra panels if the inverter has headroom and the array still performs well, or a hybrid inverter if you need more capacity, modern controls or a clear path to add a battery to an existing solar system.

Your installer checks roof space, inverter age, switchboard capacity and string design, then lodges a Western Power embedded generation application when generation equipment is added or changed. From 1 May 2026, applicable new and upgraded systems on the South West Interconnected System must meet Energy Policy WA's updated requirements, including remote management functionality and commissioning, or use the fixed 1.5 kW export arrangement if you choose not to maintain ongoing connectivity.

Eligible new panels may earn STCs on the added capacity only when Clean Energy Regulator conditions are met - eligibility is not automatic. If you also want storage, a hybrid inverter with a DC-coupled battery is usually the cleanest path under the WA Residential Battery Scheme.

When a panel or hybrid upgrade makes sense on an existing Perth system

Direct answer

Add solar panels Perth systems can still support when the inverter has spare capacity, the roof and wiring are sound, and you mainly need more daytime generation. Choose a hybrid inverter upgrade when the inverter is older or undersized, you want modern remote-management capability, or you plan to add a battery soon without discarding a sound array.

An upgrade is usually worth a serious look when your daytime self-use is high, your monitoring or retailer account shows you still import a lot of grid power when the sun is up, or you want battery storage without discarding a sound array.

Homeowners who add solar panels Perth roofs can still fit usually do so when the current inverter has spare DC input or rated capacity, roof orientation and shading work, and the switchboard is sound. Adding or switching to a hybrid inverter fits when the inverter is older or undersized, you want modern remote-management capability for a later battery, or string voltages no longer match today's modules. Either path - and sometimes both - can be cheaper and less disruptive than starting again.

Start with evidence. Pull at least 12 months of usage from your Synergy My Account (or Horizon Power account if you are outside the SWIS), your inverter app, and recent bills. That data shows whether you need more midday generation (extra panels), more evening self-use (hybrid plus battery), or both. For a time-of-use household, moving demand into solar hours can change which upgrade makes sense; compare the plans in our Synergy Midday Saver versus Home Plan A1 guide.

1 May 2026new rules for upgraded SWIS solar and battery systems
30 kVAaggregate inverter capacity on a standard connection
1.5 kWexport limit if remote management is not maintained
5 yearsSTC deeming period for eligible small-scale solar in 2026
When forcing more panels onto the old inverter is usually the wrong move

If the inverter is near the end of its warranty, the wiring would need a major rebuild to meet current standards, panel voltages no longer match modern modules, or you want a battery within a year or two and your inverter is not hybrid, Energy Policy WA's existing-system fact sheet points toward a hybrid replace or AC-coupled battery path instead of expanding an ageing string inverter. That is still an upgrade without starting again - you keep good panels where possible and change the control gear.

Should you add solar panels Perth homes already have, or replace the inverter?

Direct answer

Most Perth homes choose one of four paths when they add solar panels Perth installers recommend: keep the existing inverter and add panels, upgrade to a hybrid inverter (battery ready), add an AC-coupled battery with a supported gateway, or replace the system when rewiring or age makes a partial upgrade uneconomic. Your installer should quote the options that fit your roof, inverter and bill pattern - not only one default package.

Energy Policy WA's guidance for customers adding storage to existing solar maps cleanly onto panel and hybrid inverter upgrades as well. Use the four options below to compare a plan to add solar panels Perth households already run against a solar inverter upgrade Perth homeowners often need before a battery.

Option 1 - Add solar panels Perth systems can keep on the existing inverter

If the inverter still has capacity and the string design allows it, your installer can add solar panels Perth homes already support and treat the job as an extension. The Clean Energy Regulator allows an "extension system" STC claim on the new capacity when CER conditions are met (see the STCs section). Your existing panels that already earned STCs are not claimed again.

Network side, Western Power treats addition of new equipment as a modification: that means a new embedded generation connection application and the whole site assessed against current Basic Embedded Generator Connection Technical Requirements. Do not assume the original approval still covers the larger array. See Western Power's inverter system up to 30 kVA page for when an application is required.

Option 2 - Hybrid inverter upgrade (battery ready)

A hybrid inverter is designed to manage rooftop solar, a battery and your home loads. Energy Policy WA recommends that households installing solar-only who may add a battery later speak to their installer about a hybrid inverter, because a DC-coupled battery is usually simpler and more efficient later. Keep good modules where possible, add or replace the inverter with a hybrid, and leave a clear battery slot without ripping out a whole array that still performs. See our overview of solar inverter installation and current solar battery options when you compare quotes.

Option 3 - AC-coupled battery on the existing inverter

If you want storage now but prefer to keep a non-hybrid inverter (including microinverters), Energy Policy WA describes adding an AC-coupled battery plus a gateway device on the retailer's supported solutions list. Compatibility is not automatic: it depends on your existing inverter, the battery model, the gateway, the electrical configuration and an approved design for your site. Your installer must confirm that combination against the retailer's supported solutions list and network rules before you sign.

Option 4 - Full replacement when a partial upgrade no longer stacks up

Energy Policy WA notes that replacing a whole older system can be cheaper if an upgrade would require rewiring to current electrical standards. When upsizing overall capacity (Energy Policy WA's example is moving from about 5 kVA toward 10 kVA), options include one larger hybrid with extra panels and a DC battery, or a second hybrid inverter beside the old one with a coordinating gateway - both needing whole-of-site compliance.

OptionBest whenWatch-outs
1 - Extra panels on existing inverterInverter has headroom; panels and wiring are sound; no battery soonNew EG application; STCs only if CER-eligible; string design must fit
2 - Hybrid / battery readyYou may add a battery later; inverter is older or undersizedMay 2026 upgrade requirements apply; plan Wi-Fi or gateway
3 - AC-coupled batteryYou want storage now and the existing inverter is soundCompatibility depends on inverter, battery, gateway and approved design
4 - Full replacementRewiring or age makes a partial upgrade uneconomicPreviously claimed panels do not earn STCs again

Options summarised from Energy Policy WA existing-system battery fact sheet, Clean Energy Regulator expansion guidance and Western Power Basic EG requirements.

Can you add solar panels Perth systems already use from a different brand?

Direct answer

Sometimes yes, but brand mixing is a design decision, not a free-for-all. New panels must suit string voltage and current, inverter input limits, mounting and warranty conditions, and they must meet current product and standards requirements for any STC claim.

Mixing panel brands on one string can cause mismatch losses if voltages, currents or degradation curves differ. Installers often prefer matched modules on the same MPPT input, or a separate string or second inverter for the new array.

When you add solar panels Perth residents already own alongside a newer brand, check that new panels and the inverter (existing or new) appear on the Clean Energy Council approved products list where scheme rules require it, and that Solar Accreditation Australia technical requirements are met. Manufacturer warranties can also be affected if the system is modified outside the maker's guidance - ask both the panel brand and your installer in writing. When choosing modules for an extension, our guide to choosing the best solar panels covers quality and warranty questions to ask.

How much does it cost to add solar panels Perth homes already have?

Direct answer

There is no single Perth price when you add solar panels Perth homeowners already run. Cost depends on how many panels you add, whether the inverter and switchboard need work, roof access and mounting, Western Power compliance for the whole site, and whether STCs or battery incentives apply to eligible new equipment. Ask for itemised quotes that separate panels, labour, network paperwork and any hybrid or battery extras.

Factors that usually move the quote include:

  • Number and wattage of new panels, and whether a second string or second MPPT is needed.
  • Inverter headroom versus a hybrid upgrade or replacement inverter.
  • Switchboard, consumer mains and isolation upgrades to meet current standards.
  • Roof type, scaffolding or height access, and any shading redesign.
  • Western Power embedded generation application and whole-of-site compliance work under current Basic EG rules.
  • Retailer commissioning for remote management (or the fixed 1.5 kW export pathway) on upgrades from 1 May 2026.
  • Whether eligible new panel capacity can create STCs, and whether a battery triggers WA or federal support.

Compare at least two itemised quotes before you add solar panels Perth installers price for your roof. Energy Policy WA recommends getting more than one quote and asking each installer to price whole-of-site compliance for legacy gear. Fusion Sun Solar can assess your existing system and show which factors apply before you commit - book an existing-system assessment.

Inverter capacity, export limits and network rules

Rooftop array showing how to add solar panels Perth homes can expand

From 1 May 2026, Energy Policy WA's new requirements for small-scale solar and battery systems apply when you add solar panels Perth homes already run, or upgrade a battery system, on the SWIS. On a standard connection, households and small businesses can install inverters up to 30 kVA in aggregate, covering solar, batteries and other inverter-based sources. For single-phase homes that is a 15 kW increase in allowable installed generation capacity compared with earlier arrangements. Not sure which supply you have? Use our supply-phase identification guide if you need to check your connection.

Applicable new and upgraded systems must meet the updated requirements, including remote management functionality (the ability for your electricity retailer to remotely disconnect and reconnect the system) and commissioning at installation. Most residential DEBS systems already have the retailer switching function described by Energy Policy WA as emergency solar management.

As an alternative, customers who choose not to maintain ongoing connectivity after installation testing can use a fixed 1.5 kW export arrangement, subject to installation and commissioning requirements. Your installer confirms what applies to your site. For each inverter, check certification against AS/NZS 4777.2:2020 and make sure Australia Region B is the configured grid profile. A system dating from before 1 May 2026 can stay under its earlier arrangements while it remains unchanged; an upgrade brings the new rules into play. A similar or exact warranty inverter replacement is also exempt from the new May 2026 requirements.

Western Power's published rules add important detail when you add solar panels Perth networks already host. Installing an inverter, moving or changing one already on site, or introducing a battery or other generation source requires an Embedded Generation Connection application. Western Power's technical requirements FAQs state that any modification - including altering export or generation limits or adding new equipment - triggers a new application, and the whole site must meet current Basic EG Connection Technical Requirements.

Export limits apply net at the network connection point. Without an offtake agreement with your energy retailer, export is capped at 1.5 kW. With an offtake agreement, higher export may be allowed subject to network conditions. Homeowners remain responsible for the connection, though you can authorise your installer to lodge the paperwork.

Customer choice after commissioning

Energy Policy WA consumer guidance confirms that after installation testing, if you prefer not to join export products or cannot keep a stable internet connection, you do not have to maintain ongoing connectivity. Local solar and battery consumption continues as before under this arrangement, while electricity sent to the grid is capped at the standard 1.5 kW. Installer and retailer process detail is on the information for installers and retailers page.

Emergency Solar Management and AS/NZS 4777 on upgrades

Hybrid inverter path when you add solar panels Perth homes already run

Emergency Solar Management started on 14 February 2022 after an AEMO recommendation about low-demand risk on the SWIS. If you add solar panels Perth systems already have from 1 May 2026, use Energy Policy WA's dedicated new-requirements pages as the primary source: applicable new and upgraded systems on a standard connection must support remote disconnect and reconnect by the retailer, or else use the fixed 1.5 kW export arrangement.

Energy Policy WA notes the new rules do not specifically require the Common Smart Inverter Profile - Australia (CSIP-AUS), but the WA Government encourages retailers to adopt it. The consumer information identifies CSIP-AUS as the commissioning method for Synergy's new installations and upgrades.

Our full explainer on emergency solar management in Perth covers spring low-load days in more detail. Older ESM FAQ wording that still refers to systems of 5 kW or less is superseded for new and upgraded standard-connection systems covered by the May 2026 requirements.

Energy Policy WA's Emergency Solar Management page still notes a battery nuance: if you add a battery to an existing system without changing the existing solar, the battery must meet ESM requirements while the untouched solar does not have to be brought into compliance solely for that reason. Treat that alongside the May 2026 consumer rule that upgrades are captured by the new remote-management requirements, and alongside Western Power's rule that adding equipment still needs a new connection application and current Basic EG assessment for the site. Your installer should explain both the network application and the retailer commissioning steps (including CSIP-AUS where Synergy requires it) in the quote.

STCs on additional panels - what you can claim

Direct answer

Eligible new panel capacity may create Small-scale Technology Certificates when you add solar panels Perth homes already host, but eligibility is not automatic. You must meet Clean Energy Regulator requirements. Panels that previously received STCs cannot generate a second entitlement when they are merely replaced. Your installer confirms what can be claimed for your design.

The Clean Energy Regulator sets out clear claim types on its small-scale renewable energy systems page:

  • Extension system - add panels to an existing inverter, or add a new inverter and new panels while keeping good existing panels connected (existing panels are excluded from the new claim).
  • Additional system - add a second inverter and new panels as an extra system at the site, within overall capacity limits.
  • Replacement system - remove the old system and install all-new panels and inverter (new components only; previous STC panels do not earn again).

Keeping the inverter does not remove the Regulator's extension checks: the enlarged system must stay within 1 MW, its inverter must have room for the addition, and both that inverter and the added panels need Clean Energy Council product approval. Solar Accreditation Australia technical rules and current component standards also apply. Residential Perth upgrades sit far below the 1 MW cap. Mid-scale rules (above 100 kW) exist from 1 October 2026, but they are not relevant to a typical home.

Two timing traps matter. First, expanding a system before the initial STC claim is approved can put eligibility at risk. Second, replaced panels that already received STCs are not eligible for additional certificates. Re-certification covers safety and compliance across the complete system, not just the added hardware, and includes its electrical-installation connection. The installer must bring any non-compliant components up to the required standard.

For 2026 installs of eligible small-scale solar up to 100 kW, the deeming period is five years. That drops to four years for 2027 installs, then falls by one year each calendar year through 2030. That deeming schedule applies to eligible small-scale solar; upgrades do not automatically qualify. Use the free official calculator before you sign (see the resources section below).

Insight: STCs cut the upfront cost of eligible new panels only

Where a claim is valid, the discount is usually assigned to your retailer or installer so it appears as a lower quote on the new panels (and on a battery if you install one under the federal program). It does not refund the original system, and it does not apply if the upgrade fails CER eligibility checks.

If the upgrade includes a hybrid inverter and battery

If you add solar panels Perth upgrades often pair with a hybrid inverter and battery, that path can unlock both state and federal support, subject to scheme rules.

Under the WA Residential Battery Scheme, Synergy customers can receive a rebate of up to $1,300 and Horizon Power customers up to $3,800. Key eligibility points from Energy Policy WA include:

  • Usable storage must reach at least 5.0 kWh to qualify.
  • Rebate calculated on usable capacity up to a maximum of 10.0 kWh ($130 per kWh Synergy / $380 per kWh Horizon); larger batteries can still receive only up to the capped maximum.
  • Each property has a single rebate entitlement. An installation earlier than 1 July 2025 falls outside eligibility.
  • Virtual Power Plant (VPP) participation is required for the rebate and loan.
  • Eligible goods must appear on the relevant Synergy or Horizon Power supported solutions list and on the Clean Energy Council approved batteries and inverters lists.
  • An approved vendor applies on your behalf through the scheme administrator; installers must be licensed electricians with Grid Connected Battery Systems accreditation from Solar Accreditation Australia.

Full detail is on the eligibility requirements and information for applicants pages. A no-interest loan of $2,001 to $10,000 is available where household gross income is under $210,000. For an upgrade project, the loan may fund the battery together with solar panels or inverters, whether new or upgraded; those other items must accompany the battery installation. Our posts on Perth battery rebates before 2027, VPP requirements for WA solar battery rebates and WA May 2026 solar and battery rebate changes unpack timing and stacking in more detail.

Federally, the Department of Climate Change, Energy, the Environment and Water's Cheaper Home Batteries Program describes a discount of around 30% on eligible batteries from 5 kWh to 100 kWh, including batteries connected to existing solar. That figure is not a guaranteed fixed percentage for every quote. The benefit depends on usable capacity, the installation date, the STC factor in force, and the value passed on by your installer or retailer.

The changes dated 1 May 2026 revised the STC schedule and introduced capacity bands: a battery's first 14 kWh receives the full factor, its next 14 kWh receives 60%, and capacity beyond 28 kWh receives 15% until the 50 kWh ceiling. For May to December 2026 the STC factor is 6.8 per kWh of usable capacity before tapering. Consumers usually receive the discount through an accredited installer. Products must be Clean Energy Council accredited and installers Solar Accreditation Australia accredited.

Practical Perth checklist

  • Collect 12 months of usage from your retailer account, inverter app and bills.
  • Book a site assessment with a Solar Accreditation Australia accredited designer and installer who is also a licensed electrician.
  • Confirm whether Option 1 (add solar panels Perth systems can keep), Option 2 (hybrid inverter), Option 3 (AC-coupled battery) or Option 4 (full replacement) fits your roof, inverter age and storage plans - or a combined panel-plus-hybrid design.
  • Authorise your installer to lodge the Western Power embedded generation application for any new or changed inverter equipment or added generation source.
  • Specify Clean Energy Council approved panels, inverters and batteries in the quote where scheme rules require them.
  • Commission to AS/NZS 4777.2:2020 Australia Region B and complete retailer remote-management testing, or accept the fixed 1.5 kW export pathway where that option applies.
  • Lodge STCs only for eligible new panel capacity (and battery STCs if applicable) within scheme rules and timing - ask your installer to confirm eligibility in writing.
  • If claiming the WA battery rebate, use an approved vendor, supported products and enrol in a qualifying VPP.
  • Get more than one quote and ask each installer to price whole-of-site compliance for legacy gear, as Energy Policy WA recommends.

Common mistakes Perth homeowners make

A common failure when people add solar panels Perth systems already host is pushing the inverter beyond its rated capacity without a redesign. So is swapping to a hybrid inverter without checking export arrangements, buyback eligibility and whole-of-site compliance. Assuming the original Western Power approval still covers a larger array or a new inverter is another trap - Western Power FAQs say any addition of new equipment needs a new application and current-rule compliance for the whole site.

Treating STCs as automatic, or replacing panels and expecting a second STC claim, fails the Clean Energy Regulator's rules. Choosing a cheap non-hybrid inverter when a battery is likely within a couple of years often costs more overall than going hybrid once. Assuming any AC-coupled battery will plug into any existing inverter without checking gateway and supported-solutions compatibility creates redesign costs later.

Skipping Solar Accreditation Australia checks, Clean Energy Council product lists, or Wi-Fi and gateway planning for upgrades on or after 1 May 2026 creates commissioning delays. Finally, taking a single quote without comparing a panel-only extension, a hybrid replace and an AC-coupled gateway option makes it hard to see the true lifetime cost.

Useful solar upgrade calculators and official resources

Use these official tools and pages to check numbers and rules before you add solar panels Perth homes already run.

Synergy My Account usage history, Solar Accreditation Australia status checks and Clean Energy Council product lists are also useful. They are not linked externally here. Ask your installer to walk you through product lists and retailer commissioning in person.

Key takeaways
  • You can often add solar panels Perth systems already have, or add a hybrid inverter, without starting again, provided the design and network paperwork fit.
  • From 1 May 2026, applicable upgrades need remote retailer management functionality and commissioning, or a fixed 1.5 kW export arrangement, plus Australia Region B inverter settings.
  • Western Power treats added generation equipment as a modification that needs a new application and whole-of-site compliance under current Basic EG rules.
  • STCs may apply to eligible new panel capacity only; eligibility is not automatic and previously claimed panels do not earn again.
  • Hybrid plus battery can stack WA and federal support if VPP, product, vendor and installer rules are met - and federal "around 30%" support is not a fixed guarantee for every quote.

Add solar panels Perth - FAQ

Can I add solar panels Perth systems already have?

Often yes, when the inverter has spare capacity, the string design fits, and products meet current standards. Your installer must re-certify the whole system and lodge any required Western Power application when equipment is added or changed. STCs may apply to eligible new capacity only.

Do I need a new inverter to add solar panels Perth homes already run?

Not always. If the existing inverter has enough capacity and meets current product and standards requirements for an extension claim, you may add panels only. If the inverter is undersized, ageing, or you want a battery path, a hybrid inverter upgrade is usually the better option.

What are the options for fitting storage beside solar already installed?

Yes. Common paths are a hybrid inverter with a DC-coupled battery, or an AC-coupled battery with a supported gateway on a non-hybrid inverter. AC-coupled compatibility depends on the existing inverter, battery model, gateway, electrical configuration and approved design - your installer must confirm.

Do I need Western Power approval to add solar panels Perth networks already host?

According to Western Power, adding a battery or another generation source, fitting an inverter, or changing an inverter's location or equipment calls for an embedded generation connection application. Its FAQs also say any modification that adds new equipment or changes export or generation limits triggers a new application, and the whole site must meet current Basic EG requirements. Your installer should confirm the exact paperwork for your design.

Will STCs apply if I add solar panels Perth systems already claimed once?

Eligible new capacity may earn STCs as an extension or additional system if Clean Energy Regulator conditions are met. Eligibility is not automatic. Panels that already received STCs and are merely replaced do not earn again. Use the free REC Registry calculator for an estimate, and remember the 2026 deeming period for eligible small-scale solar is five years.

Should I add solar panels Perth homes already own, or replace the inverter?

Add solar panels Perth systems can still support when the inverter has headroom and you mainly need more daytime generation. Replace or upgrade the inverter (often to hybrid) when capacity, age, standards or a battery plan make the old inverter the limiting factor. Compare both options on the same bill data before you decide.

Can I add solar panels Perth systems already use from another brand?

Sometimes, if voltages, currents and inverter limits allow a sound design. Mixing brands on one string can reduce performance and may affect warranties. New panels and the inverter usually need to meet current approved-product and standards rules for any STC claim. Ask your installer for a written design that shows how the strings will be arranged.

Is a hybrid retrofit possible without removing the solar array?

Yes. A hybrid inverter upgrade can keep good panels where possible and leave a clear battery path. Energy Policy WA notes hybrid inverters are usually the most efficient way to add a DC-coupled battery later. The upgrade is captured by current network and May 2026 remote-management requirements.

Which SWIS upgrade requirements took effect from 1 May 2026?

Energy Policy WA requires applicable new and upgraded systems on a standard connection to support remote disconnect and reconnect by the retailer (or use a fixed 1.5 kW export arrangement), allows inverter capacity up to 30 kVA aggregate, and requires AS/NZS 4777.2:2020 Australia Region B settings. Systems not upgraded before that date stay on their previous rules until modified.

Does Emergency Solar Management apply if I upgrade?

Upgrades are captured by the current remote-management rules. From 1 May 2026 that means remote disconnect and reconnect capability or a fixed 1.5 kW export arrangement for systems within the standard-connection framework. Pre-14 February 2022 systems that are never upgraded keep their earlier status for the original ESM rules, but an upgrade changes that picture.

What export limit will I get after an upgrade?

Energy Policy WA's guidance retains a standard export allowance of up to 1.5 kW for a tested installation without ongoing retailer remote management. With an offtake arrangement and network capacity, Western Power FAQs note that higher export may be allowed subject to network conditions. Limits apply net at the connection point.

Will a warranty inverter replacement force the new May 2026 rules?

No. The exemption described by Energy Policy WA covers warranty work that substitutes an identical or similar inverter; that replacement does not have to adopt the new requirements.

How do WA and federal battery rebates fit if I add a hybrid and battery together?

The WA Residential Battery Scheme can provide up to $1,300 for Synergy customers (or $3,800 for Horizon Power) where usable capacity, VPP, supported solutions and approved-vendor rules are met. A means-tested no-interest loan can also cover related inverter and panel upgrades installed with the battery. The federal Cheaper Home Batteries Program can discount eligible batteries on existing solar via STCs; the "around 30%" figure depends on usable capacity, install date, STC factor and the value passed on. Your approved vendor usually handles both pathways.

Ready to add solar panels Perth homes already trust?

Fusion Sun Solar reviews inverter headroom, roof space, Western Power compliance and rebate eligibility, then designs a path to add solar panels Perth roofs can still take, or a hybrid inverter or battery-ready upgrade that keeps what still works. Book an existing-system assessment for a clear, written plan before you commit.

Book an existing-system assessment

Sources

  1. Energy Policy WA - New requirements for small-scale solar and battery systems (last updated 24 February 2026): wa.gov.au new requirements
  2. Energy Policy WA - Requirements for solar and batteries: information for consumers (last updated 4 August 2026): wa.gov.au consumer information
  3. Energy Policy WA - Requirements for solar and batteries: information for installers and retailers (last updated 4 August 2026): wa.gov.au installer and retailer information
  4. Energy Policy WA - Emergency Solar Management (last updated 4 August 2026): wa.gov.au emergency solar management
  5. Energy Policy WA - WA Residential Battery Scheme: wa.gov.au battery scheme
  6. Energy Policy WA - WA Residential Battery Scheme eligibility requirements: wa.gov.au battery eligibility
  7. Energy Policy WA - Information for applicants: wa.gov.au battery applicants
  8. Energy Policy WA - Existing solar systems battery options fact sheet: wa.gov.au existing-system fact sheet
  9. Western Power - Inverter system up to 30 kVA / EG connection: westernpower.com.au EG application
  10. Western Power - Basic Embedded Generator Connection Technical Requirements: westernpower.com.au Basic EG CTR
  11. Western Power - Technical requirements and standards FAQs: westernpower.com.au technical FAQs
  12. Clean Energy Regulator - Small-scale renewable energy systems (expansions): cer.gov.au small-scale systems
  13. Clean Energy Regulator - Calculate STC entitlements: cer.gov.au STC entitlements
  14. REC Registry - Small generation unit STC calculator: rec-registry.gov.au SGU calculator
  15. DCCEEW - Cheaper Home Batteries Program: dcceew.gov.au cheaper home batteries
  16. Australian Government - Solar Consumer Guide: energy.gov.au solar consumer guide

Use this Perth homeowner guide as background only. Advice for an individual property needs an assessment of that site. Rules and rebate settings can change - confirm current requirements with your installer and the official pages before you commit.